Batumi Casino
Batumi Casino
Completed
Starting date: April 2021
Completion date: September 2022
Client: ALLIANCE GROUP LTD

DOMSON’S ENGINEERING HAS SUCCESSFULLY PERFORMED AN INSTALLATION WORKS OF MEP SYSTEMS AT THE PREMIUM CLASS CASINO, LOCATED IN THE MULTIFUNCTIONAL COMPLEX ALLIANCE PALACE, IN BATUMI.

THE PROJECT IS PROVIDED WITH MODERN AND INTEGRATED SYSTEMS OF FIRE FIGHTING, HEATING, AIR CONDITIONING AND VENTILATION, USING PREMIUM QUALITY PRODUCTS OF DAIKIN.

INSTALLATION WORKS OF FIRE FIGHTING SYSTEMS ARE ENSURED BY INNOVATIVE APPROACHES IN COMPLIANCE WITH NFPA INTERNATIONAL STANDARDS, WHICH FULLY INCLUDE LIFE SAFETY AND BUILDING PROTECTION.

 

TOTAL AREA: 2000 M²

ADDRESS: 5 SHERIF KHIMSHIASHVILI STR., BATUMI, GEORGIA