The Luxury Collection by Marriott
The Luxury Collection by Marriott
Ongoing
Starting date: მარტი 2018
Completion date: ივლისი 2020
Area: 55600 m2

Construction works of the hotel – The Luxury Collection by Marriott has started, where MEP installation works are performed by Domson's Engineering. 
MEP solutions include advance Cooling & Heating systems with Cooling tower & Boilers on the roof, Diesel feeding system with underground storage tank. The ventilation system is designed with high energy efficiency recuperation and humidity control creating maximum comfort for all areas of the building including guest-rooms, public areas, and spa. 
The building is secured with a central Fire Fighting and Alarm System according to  NFPA Standards, as well as the Smoke exhaust and Pressurization Systems.  All systems are integrated in the Building Management System that can be monitored and controlled with all of its components from the central control panel.

The building will be equipped with premium quality brand products, such as Daikin, Trox, Emerson, Grundfos, Danfoss, Schneider Electric, Honeywell, etc.

Total Area: 55 600 m²
Address: N2 Gudiashvili Str., Tbilisi, Georgia