Hotel IBIS
Completed
Starting date: April 2018
Completion date: December 2019
Client: STADIUM HOTEL
DOMSON’S ENGINEERING PERFORMED MEP DESIGNS AND INSTALLATION WORKS FOR HOTEL IBIS.
WATER SUPPLY&SEWERAGE, FIRE SAFETY, HEATING, AIR CONDITIONING AND VENTILATION MODERN INTEGRATED SYSTEMS WERE INSTALLED IN THE BUILDING. ALL WORKS HAS BEEN EXECUTED BY OUR TEAM IN ACCORDANCE WITH THE ASHRAE AND NFPA INTERNATIONAL STANDARDS.
THE BUILDING WAS EQUIPPED WITH PREMIUM QUALITY PRODUCTS, SUCH AS DAIKIN, CLIVET, VBW, ETC.
TOTAL AREA: 4 200 M²
ADDRESS: 178 AGHMASHENEBELI AVE., TBILISI, GEORGIA