Laboratory of San Diego University
Completed
Starting date: November 2016
Completion date: September 2017
Client: SDSU GEORGIA BRANCH
DOMSON’S ENGINEERING FULFILLED MEP WORKS IN THE LABORATORY OF SAN DIEGO UNIVERSITY. DOMSON’S ENGINEERING COMPLETED ELECTRICITY AND HVAC SYSTEMS INSTALLATION WORKS WITH THE HIGH-TECH EQUIPMENT, USING DAIKIN-BRAND UNITS FOR THE HEATING, AIR CONDITIONING AND VENTILATION SYSTEMS.
TOTAL AREA: 1 200 M²
ADDRESS: 6 CHAVCHAVADZE AVENUE, TBILISI, GEORGIA